Installation Process

Installing a solar system involves very little disruption, and most of the work is carried out externally. The main steps of a typical installation are shown below – do please let us know if you have any questions.

  • Scaffold is erected, usually the day before installation starts
  • A few tiles are temporarily removed to reveal the load-bearing rafters
  • Principal fixtures (‘roof hooks’) are attached to the rafters
  • The tiles are replaced
  • Mounting rails are attached to the roof hooks and aligned
  • The solar panels are attached to the rails and connected electrically to each other
  • The inverter is placed where we have agreed, usually in the loft-space or another convenient location
  • An AC isolator and an energy generation meter are put next to your main consumer unit
  • Your new panels are connected to the inverter
  • The system is inspected, tested and labelled before being commissioned
  • We run through system features and operation with you
  • Scaffold is removed as soon as possible, usually the next day